Hydro Power in Nepal and SAARC Region

Hydro Power in Nepal and SAARC Region

Solution of Energy Demand in South Asian Countries                                                                                                     

  Er. Hare Ram Shrestha*

President, Nepal Engineering Association

President, Society of Consulting Architectural and Engineering Firms (SCAEF) Nepal

Executive Director, Sustainable Infrastructure Development Foundation (SIDeF),

Past Vice President, Nepal Engineers Association (NEA)

MIE ( India) Civil,  M. Sc. (Env. Mgmt.) M.Phil. (Env. Sc.)

Hydro power energy is much discussed, sought and high hoped development issue in Nepal. Not only in Nepal but South Asia’s energy was demand also expected to meet, to some extent, form the potential of Nepal’s hydro power. But due to various reasons, expectation could not be met so far. Contrary to this, Nepal is experiencing the acute shortage of much needed energy for household, industry and many other sectors. National Energy Strategy was prepared for economic growth of the country.  

Nepal National Energy Strategy: Vision of National Energy Strategy is “To meet the demand for energy services of the people of Nepal by ensuring security, sufficiency, and sustainability for its poverty reduction and economic development through the efficient use of the indigenous energy resources.”

Following Objectives are set in the Strategy;

– To make consumption of biomass energy resources sustainable

– To make hydropower resources as the main energy resources

– To reduce dependence on imported fossil fuels

– To develop alternative energy technologies such as biogas, solar, wind and etc.

Energy Profile of Nepal:  

Most of the energy (86.4%) is met by traditional, biomass, animal dung etc. Use of petroleum products covers 8.0%, coal: 2.4%, hydro-power 2.7% and renewable (other than hydro) is 0.5%, More than 225000 units, mostly household units are established. Total hydro power potential of Nepal is 83 000 MW, in which economically feasible is 43000 MW. Solar potential is 2100 MW and wind potential is 3000 MW

Hydro Power Scenario:

Most of the hydro power generation so far is run of river system. Only one plant of Kulekhani with 92 MW is storage system. Nepal has high demand in winter season and less demand in monsoon whereas power generation is high in monsoon and less generation in winter. For seasonal balance of power demand, focus should be given to build large size storage plants.

Total Installed Capacity: According to Department of Energy Development till the end of August 2015 is 718.099 MW hydropower is generated from 43 hydro power plants and 53.41 MW from 2 thermal powers. In which run of river system is 626 MW and storage system is 92 MW.

Generation license is issued to 97 hydro powers, ranging from 1.5 MW to 102 MW Madhya Bhotekoshi HEP. Most of these projects are under-construction. After completion of these projects, additional 2205.433 MW power will be generated. Electricity access is limited to 48% population. Dry Season Capacity is much almost half of installed capacity.

Electricity production in 2020 is expected to be 10107 MW in rainy season and 5486 MW during dry season. Demand forecast in 2020 is 2882 MW. Thus there will be surplus of 7225 MW in rainy season and 2604 MW during dry season. However real demand calculated could be more, if more industry and large development projects in

Policy and Institutional Initiatives: Major policy documents guiding energy production, development, utilization and regulation in Nepal are as follows;          

·    Industrial Policy – 1992

  • ·      Foreign Investment & One-Window Policy-1992 
  • Hydropower Development Policies 1 992 and 2001, Water Resources Act 1 992, and Electricity Act 1 992

·      Water Resources Strategy 2002 and National Water Plan 2005

·      National Electricity Crisis Resolution Action Plan 2008

·      Report of the Task Force for Hydropower Development 2008

·      Rural Energy Policy 2006

·      Forest Sector policies and Forest Act, 1 992

·      Industrial Enterprises Act – 1 992

·      Foreign Investment and Technology Transfer Act – 1 992

o  Environment Protection Act – 1996 (Regulation-1997)

Problem and Challenges: Country is experiencing Heavy load shedding during dry season which has hampered daily life and all round development. Nepal is heavily dependent on traditional source of energy due very limited utilization of hydropower potential. Lack of supporting infrastructure (inaccessibility in remote mountain area) is another major hurdle in developing hydropower projects. High potential of hydropower in northern part of Nepal is seriously affected by inaccessibility. Current prolonged political instability and Maoist insurgency in last decade, also back tracked the hydropower development along with other infrastructure development works in Nepal.

Due to lack of good governance, there is less investment-friendly environment for the investor, despite various incentive package announced by the government. Present leadership is heavily engaged on political affairs e.g. state restructuring, new constitution etc. Fresh conflict in various parts of the country has further worsened the development environment. License holders of power generation are also slow in implementing the projects. Delay in power sector restructuring, slow expansion of grid, high construction/production cost, less pricing etc are other problems that is hindering the hydro power development in the country.

 

Way Forward and Regional Cooperation:

South Asia has an economic hydropower potential of more than 200,000 MW. Bhutan has 24,000 MW, India 84,400 MW, Nepal 43,000 MW, and Pakistan has 40,000 MW hydro power potential. When this potential hydropower is developed in South Asia region, much needed energy could be supplied. This will provide an excellent opportunity for energy trade within the region to bridge the demand-supply gap.

To materialize the power trade potential of South Asia, regional networking for Energy Sector Master Plan is required. A regional power grid system should be established along with regional natural gas grid. Obviously a strong political will and commitment is the precondition.

Substantial financing is required. If the production cost is US $ 2 Million for 1 MW, US $ 28 Billion for investment is required to produce 10000 MW of hydro power. To implement the huge hydropower projects in the region, substantial foreign Investment required, more Incentives are to be introduced, security situation has to be improved and improvement of institutional capacity of the region.

 

References:

  • R. Shrestha “Energy Problem in Nepal: Causes and Solutions” FEISCA Seminar, 44th Institution of Engineers Pakistan, Lahore, November 2011.

  • DOED, doed.gov.np Operating Projects, 29 August 2015.

  • South Asia Initiative for Energy, USAID “Regional Energy Security for South Asia”

  • Muhammad Pervaz, “The Energy Cooperation in South Asia under SAARC Umbrella” 6th Japan -SAARC Symposium, 6 -7 March 2013, Kathmandu

 

 

 

प्रतिक्रिया दिनुहोस्